Space & Defense entity

Artemis

Company

All 4 tracked stories fall under one category: launches. Artemis is most often covered alongside NASA, which appears in 4 of these 4 stories. That works out to roughly 1.6 stories per week across a 17-day span. At 7.8, the average consequence score sits above the same-window beat average of 7.2.

Last mentioned: Feb 18, 2026

Entity pulse

Recent coverage · Artemis

4 stories
7.8 avg impact
50% positive
25% negative

Coverage balance Positive coverage leads. Positive coverage exceeds negative coverage by 25 percentage points.

  • 50% positive
  • 25% neutral
  • 25% negative

Figures are computed live from our source-verified story record — see our methodology for how impact and sentiment are derived.

What the coverage shows about Artemis

All 4 tracked stories fall under one category: launches. Artemis is most often covered alongside NASA, which appears in 4 of these 4 stories. That works out to roughly 1.6 stories per week across a 17-day span. At 7.8, the average consequence score sits above the same-window beat average of 7.2. They are less corroborated than the beat average, carrying 2.5 original sources each against 3 for the same window. Artemis appears in 4 tracked Space & Defense stories published from February 19, 2026 through March 7, 2026.

Stories tracked
4
Per week
1.6
Sources per story
2.5

Computed from the 4 stories linked to this entity, with beat comparisons drawn from all 259 Space & Defense stories published in the same date window. Shares are omitted below five stories and comparisons below a twenty-story baseline.

Coverage cohort

Appears alongside

Other entities that clear the same relevance threshold in stories also covering Artemis. Shared-story counts are live from our verified record — not editorial picks.

Timeline

  1. Projected Gateway Launch

    Target window for first Vulcan-led delivery of Gateway logistics or modules.

  2. Artemis III Landing

    Planned return of humans to the lunar surface.

  3. Targeted Artemis II Launch

    First crewed mission of the Artemis program (Projected).

  4. New Launch Target

    NASA aims for a revised launch window for the crewed lunar flyby.

  5. Artemis Selection

    NASA officially integrates Vulcan Centaur 5 into the Artemis mission architecture.

  6. Target Launch

    Scheduled liftoff for the first crewed lunar mission in over 50 years.

  7. VAB Rollback

    Planned return to the Vehicle Assembly Building for hardware repairs.

  8. Second Fueling Test

    Critical wet dress rehearsal to validate hardware for crewed flight.

  9. Final Integration

    Orion spacecraft and SLS rocket undergo final stacking and testing at KSC.

  10. Malfunction Detected

    Helium system failure identified during launch pad preparations.

  11. NSSL Certification

    Completion of required flights for National Security Space Launch certification.

  12. Vulcan Maiden Flight

    Successful inaugural launch of the Vulcan Centaur (Cert-1) carrying the Peregrine lunar lander.

  13. Crew Announcement

    NASA and CSA name the four astronauts assigned to the Artemis II mission.

  14. Artemis I Launch

    Successful uncrewed flight of SLS and Orion to lunar orbit.

Stories mentioning Artemis 4

Artemis is linked from 4 stories on this site, each scored at or above our 35% relevance threshold — see how these pages are built.

See something wrong on this page — a misattributed entity, a wrong stat, a broken source link? Report a data issue.