Space Launch System (SLS)

Technology

Last mentioned: Mar 24, 2026

Timeline

  1. Wet Dress Rehearsal

    Full propellant loading and countdown practice at the pad.

  2. Artemis I Success

    Uncrewed Orion spacecraft completes 25-day mission around the Moon.

  3. Artemis I Success

    Uncrewed SLS and Orion successfully complete lunar orbit mission.

  4. Artemis I Launch

    Successful uncrewed flight of SLS and Orion to lunar orbit.

  5. Artemis 1 Success

    Uncrewed SLS and Orion mission successfully tests lunar orbit and return.

  6. Artemis I Success

    Uncrewed SLS and Orion complete maiden flight around the Moon.

  7. Flight Clearance

    NASA officially clears the rocket and spacecraft for crewed flight.

  8. Artemis 2 Rollout

    Rocket moves to Launch Pad 39B for final pre-flight testing.

  9. Targeted Artemis II Launch

    First crewed mission of the Artemis program (Projected).

  10. Target Launch

    Projected window for the Artemis 2 crewed lunar flyby mission.

  11. Schedule Realignment

    NASA officially delays Artemis II crewed flight to September 2025 citing safety concerns.

  12. Second Fueling Test

    Critical wet dress rehearsal to validate hardware for crewed flight.

  13. VAB Rollback

    NASA initiates return to VAB for critical repairs after pad testing identifies technical issues.

  14. Artemis II Launch

    First crewed flight of the SLS and Orion on a lunar flyby mission.

  15. Scheduled Launch

    Artemis II set to launch from Kennedy Space Center Launch Complex 39B.

  16. Artemis III Landing

    Planned return of humans to the lunar surface.

  17. Artemis III

    Planned mission to land the first woman and person of color on the lunar surface.

  18. Launch Window Opens

    The earliest possible date for the Artemis mission launch.

  19. Final Pad Checkouts

    Engineers begin integrated testing of the rocket and ground systems.

  20. Rollout to Pad 39B

    The SLS rocket leaves the VAB for the launch pad.

Stories mentioning Space Launch System (SLS) 7

Launches Bullish

NASA Returns Repaired Artemis Rocket to Pad for Early April Launch

NASA has successfully transported its Space Launch System (SLS) rocket back to Launch Pad 39B following critical repairs in the Vehicle Assembly Building. The move sets the stage for a high-stakes lunar mission window opening in early April, marking a pivotal moment for the Artemis program.

2 sources
Launches Bearish

NASA Rolls Artemis II Moon Rocket Back to VAB for Critical Repairs

NASA has initiated the rollback of the Artemis II Space Launch System (SLS) from Launch Pad 39B to the Vehicle Assembly Building following the identification of technical issues requiring a controlled environment. This maneuver signals a potential shift in the launch window for the first crewed lunar mission in over half a century.

2 sources
Launches Bearish

NASA Artemis Moon Mission Delayed: Launch Pushed Back One Month

NASA has officially delayed its upcoming lunar mission by approximately 30 days, marking the latest in a series of setbacks for the Artemis program. The delay underscores the persistent technical and logistical challenges of returning humans to the lunar surface.

2 sources
Launches Neutral

NASA’s Critical Fueling Test Sets the Stage for Artemis Lunar Return

NASA has initiated its second major rocket fueling test for the Artemis program, a pivotal milestone that will dictate the launch window for the next crewed lunar mission. This technical validation is essential for ensuring the integrity of the Space Launch System (SLS) and the safety of the astronauts slated for the historic journey.

2 sources

About Space Launch System (SLS) coverage

This page surfaces every story mentioning Space Launch System (SLS) across our space & defense coverage. We track each entity's appearance over time so readers can trace how the narrative evolves — which developments are isolated incidents, which build into longer arcs, and which reframe how operators in the space think about the entity. Story selection uses the same multi-source verification gate applied across the rest of our coverage.

Read our editorial methodology for how we identify, deduplicate, and score entity references. Our glossary defines the technical terms used across stories on this page, and our trends index contextualizes individual developments against the longer-running space & defense beat. Cross-entity comparisons live on our compare view.

What you seeWhat it tells you
Story countNumber of distinct stories where Space Launch System (SLS) was a primary or referenced actor.
Recency clusteringWhether mentions are concentrated in a recent window (a news cycle) or distributed (a sustained arc).
Sentiment distributionAggregate sentiment of the stories mentioning this entity, weighted by impact score.
Cross-niche linksWhen the same entity surfaces in our sibling networks, we link to those views to enrich context.